Skip to content
Roxon

Illustrative image

Roxon BESS Pro installed next to an open-pit mine

Industrial storage (BESS)

Storage for operating with fewer generator hours.

LFP systems from 15 to 540 kW and 33 to 660 kWh that take the low load at mine sites, construction sites, camps and pumping stations, and start the generator only when needed. Portable, skid-mounted, high-power or with an integrated generator.

01Models
02

Solves: Generators running at low load on construction sites and camps

Roxon BESS 50–150 kW

102 to 205 kWh · 415 V · 3 MPPT

50 / 90 / 150 kW102–205 kWh415 VLFPIP54

View product →

Not sure which model fits? Tell us the load and we’ll propose a configuration.

Ask about a solution